45-006
Chest construction starts with marking every layer for the correct spacing

45-046
Organ building is fun!

45-069
Stacks of wood pipes. These are about to get their caps

45-142
Andrew made a jig to wire the draw knobs on a curved terrace

45-145
Brandon nicks a Rohrflute

45-217
The console will look stunning in maple

45-335
Rob checks the spacing of each terrace

45-404
The console is stained and finished, ready for wiring

45-420
The facade goes up in the erecting room

45-482
The completed console

45-488
Mirror image facade

P8090004
The Tuba Magna after racking. (Also, it happens to be facing Muncie in this picture)

P8310064
Sursa hall during installation

BSUOrgan  002
Finished!